Facility Name:
|
Troy & Jay
|
|
|
Steve Button Chief Operator
|
|
|
Troy/Jay
|
|
|
Troy Pump Station at the junction of Routes 100 & 101 in Troy
|
|
|
11/01/2019
|
|
|
11/01/2019
|
|
|
09:00 am to 10:30 am
|
|
|
|
|
|
Discharged untreated sewage
|
|
|
>1,000 to 10,000 gallons
|
|
|
Other
|
|
|
|
|
|
Other
|
|
|
At 11:30 am the water had receded to below the top of the berm so the wastewater is now contained within the berm. We have made arrangements to have pumper trucks on site to pump the tank out as soon as the road to the pump station is reopened. The plan is to continue pumping and hauling the wastewater to the WWTF until the pump station is operational.
|
|
|
Missisquoi River
|
|
|
Steve Button, Chief Operator
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
Due to heavy rains the Missisquoi River flooded the entire area (including fields, homes, and roads) and rose to a level that breached the berm surrounding the pump station. The pump station is currently sitting in a "lake" of flood waters complete with white caps due to high winds.
|
|
|
|
|
|
HNT-YXQ0-JQDWA
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|