Waste Water Inventory Website
GoTo=>             Watershed Management Website Drinking Water Website Waste Management Website
View FacilityIncident Record

Skip Navigation Links

Facility Name: Hartford - WRJ    
Caller Name And Title: Earl dyke - Chief Operator    
Municipality: town of hartford    
Location (street or site): wilder    
Incident Start Date: 07/01/2017    
Incident End Date:    
Incident Start End Times: 10:00 am to 10:00 pm    
Estimated Duration Of Event:    
Nature Of Incident: Authorized Wet Weather CSO Overflow    
Estimated Volume (gallons): >100 to 1,000 gallons    
Cause Of Discharge: Other    
Type Of Obstruction: none    
Point Of Discharge: Pump station emergency overflow pipe    
Corrective Action Taken: none    
Waterbody Impacted: connecticut river    
Contact Name And Title For Public: Earl Dyke    
Call Date:    
WW Staff Called:    
Type Of Notification: nForms    
Public Overflow Report For Web: Y    
   
   
   
Description Of Incident: high flows caused by intense rain storm. We had 4.5 inches of rain in a in approximately 6-8 hours. This caused a combination of sewage and storm water from CSO 004 (wilder pump station).this is a authorized discharged intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backup into homes and other buildings.    
   
nForm Submission Number: HN6-24H5-WC3GE