Facility Name:
|
Hartford - WRJ
|
Caller Name And Title:
|
Earl dyke - Chief Operator
|
Municipality:
|
town of hartford
|
Location (street or site):
|
wilder
|
Incident Start Date:
|
07/01/2017
|
Incident End Date:
|
|
Incident Start End Times:
|
10:00 am to 10:00 pm
|
Estimated Duration Of Event:
|
|
Nature Of Incident:
|
Authorized Wet Weather CSO Overflow
|
Estimated Volume (gallons):
|
>100 to 1,000 gallons
|
Cause Of Discharge:
|
Other
|
Type Of Obstruction:
|
none
|
Point Of Discharge:
|
Pump station emergency overflow pipe
|
Corrective Action Taken:
|
none
|
Waterbody Impacted:
|
connecticut river
|
Contact Name And Title For Public:
|
Earl Dyke
|
Call Date:
|
|
WW Staff Called:
|
|
Type Of Notification:
|
nForms
|
Public Overflow Report For Web:
|
Y
|
|
|
|
|
|
|
Description Of Incident:
|
high flows caused by intense rain storm. We had 4.5 inches of rain in a in approximately 6-8 hours. This caused a combination of sewage and storm water from CSO 004 (wilder pump station).this is a authorized discharged intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backup into homes and other buildings.
|
|
|
nForm Submission Number:
|
HN6-24H5-WC3GE
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|