Waste Water Inventory Website
GoTo=>             Watershed Management Website Drinking Water Website Waste Management Website
View FacilityIncident Record

Skip Navigation Links

Facility Name: Winooski    
Caller Name And Title: John Choate    
Municipality: City of Winooski    
Location (street or site): Pine Grove Terrace    
Incident Start Date: 06/27/2022    
Incident End Date: 06/27/2022    
Incident Start End Times: 11:15 am to 12:00 pm    
Estimated Duration Of Event:    
Nature Of Incident: Discharged untreated sewage    
Estimated Volume (gallons): >100 to 1,000 gallons    
Cause Of Discharge: Crack/Hole in Pipe    
Type Of Obstruction:    
Point Of Discharge: Stormwater collection system    
Corrective Action Taken: The pump station was shut off and a contractor is preparing to make repairs to the force main. Also the Pond forebay is being cleaned out.    
Waterbody Impacted: Pine Grove Terrace Stormwater pond (More    
Contact Name And Title For Public: John Choate    
Call Date:    
WW Staff Called:    
Type Of Notification: nForms    
Public Overflow Report For Web: Y    
   
   
   
Description Of Incident: A broken force main from a private pump station leaked into a stormwater detention pond.    
   
nForm Submission Number: HPJ-RAZE-GW2AE