|
Facility Name:
|
Winooski
|
|
|
John Choate
|
|
|
City of Winooski
|
|
|
Pine Grove Terrace
|
|
|
06/27/2022
|
|
|
06/27/2022
|
|
|
11:15 am to 12:00 pm
|
|
|
|
|
|
Discharged untreated sewage
|
|
|
>100 to 1,000 gallons
|
|
|
Crack/Hole in Pipe
|
|
|
|
|
|
Stormwater collection system
|
|
|
The pump station was shut off and a contractor is preparing to make repairs to the force main. Also the Pond forebay is being cleaned out.
|
|
|
Pine Grove Terrace Stormwater pond (More
|
|
|
John Choate
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
A broken force main from a private pump station leaked into a stormwater detention pond.
|
|
|
|
|
|
HPJ-RAZE-GW2AE
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|