|
Facility Name:
|
Williamstown
|
|
|
Allen Chouinard Chief Operator
|
|
|
Williamstown
|
|
|
Stevens Branch on Brockway Hill
|
|
|
11/08/2023
|
|
|
11/09/2023
|
|
|
09:30 am to 04:00 pm
|
|
|
|
|
|
Other
|
|
|
>10,000 to 100,000 gallons
|
|
|
Other
|
|
|
|
|
|
WWTF outfall
|
|
|
Shut plant down on 11/9/2023 @ 4:00pm for re sample on Monday morning 11/13/2023. Opened flow on 11/13/2023 @ 7:00am. Re sampled 11:00am 11/13/2023. With a chlorine residual of 2.05 mg/l and de chlorinated at 0.00 mg/l. Shut plant back down pending result from lab. Re sample lab result for ecoli was 6.69 CFU/100mls well below the 77 CFU/100mls allowed.
|
|
|
Stevens Branch
|
|
|
Allen Chouinard Chief Operator
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
Took ecoli sample on 11/8/2023 @9:30am on 11/9/2023 @ 3:30 pm notified by lab of High E coli result from lab, >800 CFU/100mls , shut plant down for resample. Pre De Chlorination sample Chlorine residual was 1.71 mg/l. De chlorinated was 0.00 mg/l. Suspect lab error. Opened flow Monday morning 11/13/2023 at 7:00am, Re sampled at11:00am 11/13/2023. With a chlorine residual of 2.05 mg/l and de chlorinated at 0.00 mg/l. Shut plant back down pending result from lab.
|
|
|
|
|
|
HPZ-4ADM-17YZ7
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|