Facility Name:
|
West Rutland
|
Caller Name And Title:
|
Seth Pietryka, Superintendent
|
Municipality:
|
Town of West Rutland
|
Location (street or site):
|
Elm st. pump station
|
Incident Start Date:
|
12/26/2021
|
Incident End Date:
|
12/27/2021
|
Incident Start End Times:
|
08:00 pm to 07:30 am
|
Estimated Duration Of Event:
|
|
Nature Of Incident:
|
Discharged untreated sewage
|
Estimated Volume (gallons):
|
>10,000 to 100,000 gallons
|
Cause Of Discharge:
|
Pump Malfunction
|
Type Of Obstruction:
|
|
Point Of Discharge:
|
Pump station emergency overflow pipe
|
Corrective Action Taken:
|
A-1 and Champlins were called to work on the issues and pump sewage down so it was not overflowing. We able to get the pumps back running and seem normal and alarm system working.
|
Waterbody Impacted:
|
West Rutland swamp
|
Contact Name And Title For Public:
|
Seth Pietryka, Superintendent
|
Call Date:
|
|
WW Staff Called:
|
|
Type Of Notification:
|
nForms
|
Public Overflow Report For Web:
|
Y
|
|
|
|
|
|
|
Description Of Incident:
|
VFD failure on both pumps caused total shut down in pump station and sewer to eventually discharge out of the emergency overflow. Alarm system failed to call out even though it was just check a couple weeks ago. So, the issue was not found until normal work hours.
|
|
|
nForm Submission Number:
|