Facility Name:
|
West Rutland
|
|
|
Seth Pietryka Wastewater Superintendent
|
|
|
Town of West Rutland
|
|
|
West Rutland
|
|
|
02/16/2021
|
|
|
02/16/2021
|
|
|
01:00 pm to 02:00 pm
|
|
|
|
|
|
Other
|
|
|
>100 to 1,000 gallons
|
|
|
Crack/Hole in Pipe
|
|
|
|
|
|
Crack/hole in pipe
|
|
|
Call in A-1 to take wastewater that was gathering in the Harrison ave pump station and transport it to the elm st pump station so it could then go to the sewer r plant and be treated along with the rest of the towns wastewater. Fabian Earth moving repaired the broken pipe and tested to make sure there were no other leaks.
|
|
|
West Rutland Swamp between Harrison ave.
|
|
|
Seth Pietryka West Rutland Wastewater superintendent
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
GMP was drilling to install new power poll and struck and broke the sewer force main approximately 6-7ft below ground level.
|
|
|
|
|
|
HP6-JTAW-ETR6R
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|