Facility Name:
|
Barre City
|
|
|
Brian Baker, Director of Public Works
|
|
|
Barre City
|
|
|
Sewer manhole on Hill Street had a blockage and overflowed into a nearby catch b
|
|
|
11/24/2026
|
|
|
11/24/2026
|
|
|
07:30 am to 09:00 am
|
|
|
|
|
|
Discharged untreated sewage
|
|
|
1800
|
|
|
Obstruction/Blockage
|
|
|
Not known, in sewer pipe
|
|
|
Manhole
|
|
|
DPW crew with vactor truck on site and removed the blockage
|
|
|
Potash Brook
|
|
|
Brian Baker, Director of Public Works
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
A sewer back up was reported to DPW at about 7:30 am on the 24th. Crews with the vactor truck were deployed. The overflow from the manhole was estimated at about 20 gallons per minute. DPW crews are working on clearing the blockage to restore flow as normal. It is estimated to be cleared by 9:00 on the 24th.
|
|
|
|
|
|
HQT-A5XV-16XYD
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|