Facility Name:
|
Barre City
|
Caller Name And Title:
|
Brandon Guyette Assistant Chief
|
Municipality:
|
Barre City
|
Location (street or site):
|
WWTP
|
Incident Start Date:
|
06/20/2024
|
Incident End Date:
|
06/24/2024
|
Incident Start End Times:
|
07:00 am to 12:00 pm
|
Estimated Duration Of Event:
|
|
Nature Of Incident:
|
Discharged treated and partly disinfected effluent
|
Estimated Volume (gallons):
|
13000000
|
Cause Of Discharge:
|
Pump Malfunction
|
Type Of Obstruction:
|
|
Point Of Discharge:
|
WWTF outfall
|
Corrective Action Taken:
|
Switch a 8 valves and primed the back up RAS pump so we recycle the sludge in the clarifier.
|
Waterbody Impacted:
|
Winooski River
|
Contact Name And Title For Public:
|
Brian Baker
|
Call Date:
|
|
WW Staff Called:
|
|
Type Of Notification:
|
nForms
|
Public Overflow Report For Web:
|
Y
|
|
|
|
|
|
|
Description Of Incident:
|
Arrived at the plant to a RAS pump that failed sludge was overflowing the weirs on clarifier #3. TRC was 0.02 at the time of the Ecoli. We got a 29.2 Ecoli on Monday 6-24-24 with a TRC of 0.58
|
|
|