Waste Water Inventory Website
GoTo=>             Watershed Management Website Drinking Water Website Waste Management Website
View FacilityIncident Record

Skip Navigation Links

Facility Name: Barre City    
Caller Name And Title: Brandon Guyette Assistant Chief    
Municipality: Barre City    
Location (street or site): WWTP    
Incident Start Date: 06/20/2024    
Incident End Date: 06/24/2024    
Incident Start End Times: 07:00 am to 12:00 pm    
Estimated Duration Of Event:    
Nature Of Incident: Discharged treated and partly disinfected effluent    
Estimated Volume (gallons): 13000000    
Cause Of Discharge: Pump Malfunction    
Type Of Obstruction:    
Point Of Discharge: WWTF outfall    
Corrective Action Taken: Switch a 8 valves and primed the back up RAS pump so we recycle the sludge in the clarifier.    
Waterbody Impacted: Winooski River    
Contact Name And Title For Public: Brian Baker    
Call Date:    
WW Staff Called:    
Type Of Notification: nForms    
Public Overflow Report For Web: Y    
   
   
   
Description Of Incident: Arrived at the plant to a RAS pump that failed sludge was overflowing the weirs on clarifier #3. TRC was 0.02 at the time of the Ecoli. We got a 29.2 Ecoli on Monday 6-24-24 with a TRC of 0.58    
   
nForm Submission Number: HQ4-MAZJ-6GSCR