Facility Name: Barre City    
Brandon Guyette Assistant Chief    
Barre City    
WWTP    
06/20/2024    
06/24/2024    
07:00 am to 12:00 pm    
   
Discharged treated and partly disinfected effluent    
13000000    
Pump Malfunction    
   
WWTF outfall    
Switch a 8 valves and primed the back up RAS pump so we recycle the sludge in the clarifier.    
Winooski River    
Brian Baker    
   
   
nForms    
Y    
   
   
   
Arrived at the plant to a RAS pump that failed sludge was overflowing the weirs on clarifier #3. TRC was 0.02 at the time of the Ecoli. We got a 29.2 Ecoli on Monday 6-24-24 with a TRC of 0.58    
   