|
Facility Name:
|
Barre City
|
|
|
Brandon Guyette Assistant Chief
|
|
|
Barre City
|
|
|
WWTP
|
|
|
06/20/2024
|
|
|
06/24/2024
|
|
|
07:00 am to 12:00 pm
|
|
|
|
|
|
Discharged treated and partly disinfected effluent
|
|
|
13000000
|
|
|
Pump Malfunction
|
|
|
|
|
|
WWTF outfall
|
|
|
Switch a 8 valves and primed the back up RAS pump so we recycle the sludge in the clarifier.
|
|
|
Winooski River
|
|
|
Brian Baker
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
Arrived at the plant to a RAS pump that failed sludge was overflowing the weirs on clarifier #3. TRC was 0.02 at the time of the Ecoli. We got a 29.2 Ecoli on Monday 6-24-24 with a TRC of 0.58
|
|
|
|
|
|
HQ4-MAZJ-6GSCR
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|