|
Facility Name:
|
Barre City
|
|
|
Bill Ahearn
|
|
|
City of Barre
|
|
|
800 feet from the Berlin- Barre City line along US 302
|
|
|
10/28/2021
|
|
|
10/28/2021
|
|
|
12:00 pm to 03:00 pm
|
|
|
|
|
|
Discharged untreated sewage
|
|
|
Under 100 gallons
|
|
|
Mechanical Failure
|
|
|
Minor annular leakage around an existing
|
|
|
Crack/hole in pipe
|
|
|
A second plug was added to pump station overflow.
|
|
|
Stevens Branch
|
|
|
Bill Ahearn Director of Public Works
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
Unconfirmed raw sewage release, presumed to occur from a leaking mechanical plug. The incident was concluded by the installation of two sequential plugs in the pipe. Under the presumption, the leak was from that source.
|
|
|
|
|
|
HPC-TANM-RNQEP
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|