Facility Name:
|
WestRock Converting Company
|
|
|
Quinn Mahoney - Sr Process Engineer
|
|
|
Not a municipality
|
|
|
Sheldon Springs
|
|
|
07/26/2025
|
|
|
07/26/2025
|
|
|
02:43 am to 04:10 am
|
|
|
|
|
|
Other
|
|
|
70000
|
|
|
Crack/Hole in Pipe
|
|
|
|
|
|
Stormwater collection system
|
|
|
The valve from the primary clarifier going back to the mill was closed when the discharge was discovered. An excavation company was contracted and the pipe was repaired by 5:00 PM 7/28/2025. Flow restored at 10:00 AM 7/29/2025.
|
|
|
Missisquoi River
|
|
|
Charlie Loiselle, General Manager
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
Recovered paper fiber (<5%) and process water are returned to the paper mill from the primary clarifier via a 6" underground pipe. This pipe cracked on 7/26/25 at 2:43 am. Once the unpermitted discharge was discovered, the valve from the primary clarifier was closed and flow to the Missisquoi River stopped at 4:10 am.
|
|
|
|
|
|