Facility Name: WestRock Converting Company    
Caller Name And Title: Quinn Mahoney - Sr Process Engineer    
Municipality: Not a municipality    
Location (street or site): Sheldon Springs    
Incident Start Date: 07/26/2025    
Incident End Date: 07/26/2025    
Incident Start End Times: 02:43 am to 04:10 am    
Estimated Duration Of Event:    
Nature Of Incident: Other    
Estimated Volume (gallons): 70000    
Cause Of Discharge: Crack/Hole in Pipe    
Type Of Obstruction:    
Point Of Discharge: Stormwater collection system    
Corrective Action Taken: The valve from the primary clarifier going back to the mill was closed when the discharge was discovered. An excavation company was contracted and the pipe was repaired by 5:00 PM 7/28/2025. Flow restored at 10:00 AM 7/29/2025.    
Waterbody Impacted: Missisquoi River    
Contact Name And Title For Public: Charlie Loiselle, General Manager    
Call Date:    
WW Staff Called:    
Type Of Notification: nForms    
Public Overflow Report For Web: Y    
   
   
   
Description Of Incident: Recovered paper fiber (<5%) and process water are returned to the paper mill from the primary clarifier via a 6" underground pipe. This pipe cracked on 7/26/25 at 2:43 am. Once the unpermitted discharge was discovered, the valve from the primary clarifier was closed and flow to the Missisquoi River stopped at 4:10 am.    
   
nForm Submission Number: HQE-EPT8-CTRM8