Facility Name:
|
WestRock Converting Company
|
Caller Name And Title:
|
Quinn Mahoney - Sr Process Engineer
|
Municipality:
|
Not a municipality
|
Location (street or site):
|
Sheldon Springs
|
Incident Start Date:
|
07/26/2025
|
Incident End Date:
|
07/26/2025
|
Incident Start End Times:
|
02:43 am to 04:10 am
|
Estimated Duration Of Event:
|
|
Nature Of Incident:
|
Other
|
Estimated Volume (gallons):
|
70000
|
Cause Of Discharge:
|
Crack/Hole in Pipe
|
Type Of Obstruction:
|
|
Point Of Discharge:
|
Stormwater collection system
|
Corrective Action Taken:
|
The valve from the primary clarifier going back to the mill was closed when the discharge was discovered. An excavation company was contracted and the pipe was repaired by 5:00 PM 7/28/2025. Flow restored at 10:00 AM 7/29/2025.
|
Waterbody Impacted:
|
Missisquoi River
|
Contact Name And Title For Public:
|
Charlie Loiselle, General Manager
|
Call Date:
|
|
WW Staff Called:
|
|
Type Of Notification:
|
nForms
|
Public Overflow Report For Web:
|
Y
|
|
|
|
|
|
|
Description Of Incident:
|
Recovered paper fiber (<5%) and process water are returned to the paper mill from the primary clarifier via a 6" underground pipe. This pipe cracked on 7/26/25 at 2:43 am. Once the unpermitted discharge was discovered, the valve from the primary clarifier was closed and flow to the Missisquoi River stopped at 4:10 am.
|
|
|
nForm Submission Number:
|
HQE-EPT8-CTRM8
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|