|
Facility Name:
|
South Burlington - Airport Parkway
|
|
|
Robert Fischer Water Quality Superintendent
|
|
|
South Burington
|
|
|
375 Hinesburg Road
|
|
|
12/19/2023
|
|
|
12/19/2023
|
|
|
12:00 am to 11:00 pm
|
|
|
|
|
|
Discharged untreated sewage
|
|
|
>500,000 to 1,000,000 gallons
|
|
|
Crack/Hole in Pipe
|
|
|
|
|
|
Pump station emergency overflow pipe
|
|
|
Pipe repaired.
|
|
|
Potash Brook
|
|
|
Robert Fischer Water Quality Superintendent
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
A 20" AC line from the 1960's failed, possibly due to movement due to intense rainfall and/or age of pipe. The pumpstation could not pump and overflowed through the overflow until the line was fixed.
|
|
|
|
|
|
HQ0-0Q8J-XYKJB
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|