Facility Name:
|
St Johnsbury
|
|
|
Ethan Graham - Chief Operator
|
|
|
St. Johnsbury
|
|
|
CSO – 21: (Passumpsic St at the junction of Tremont St.)
|
|
|
05/29/2026
|
|
|
05/30/2026
|
|
|
10:10 pm to 04:14 am
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
22532
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
Passumpsic River
|
|
|
Steve Bearegard
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High Flows caused by heavy rain on 05/29/2026 resulted in the discharge of a combination of sewage and storm water from CSO - 21. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system and to prevent backups into homes and other buildings.
|
|
|
|
|
|