Facility Name:
|
St Johnsbury
|
|
|
Ethan Graham - Chief Operator
|
|
|
St. Johnsbury
|
|
|
CSO – 06: (Bay Street – south of CVPS)
|
|
|
04/19/2026
|
|
|
04/19/2026
|
|
|
10:15 am to 12:15 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
15305
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
Passumpsic River
|
|
|
Steve Beauregard
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High Flows caused by heavy rain on 04/19/2026 resulted in the discharge of a combination of sewage and storm water from CSO - 06. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system and to prevent backups into homes and other buildings.
|
|
|
|
|
|