|
Facility Name:
|
St Johnsbury
|
|
|
Jim Brimblecombe - Chief Operator
|
|
|
St. Johnsbury
|
|
|
CSO – 07: (River Road and Portland Street)
|
|
|
05/27/2025
|
|
|
05/27/2025
|
|
|
11:00 am to 12:30 pm
|
|
|
|
|
|
Discharged untreated sewage
|
|
|
1000
|
|
|
Obstruction/Blockage
|
|
|
Grease
|
|
|
Combined sewer overflow structure
|
|
|
VACON removed the blockage and cleaned the lines
|
|
|
Passumpsic River
|
|
|
Steve Beauregard
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
Grease ball blocked the downstream piping from CSO 07, causing approximately 1000 gallons of wastewater to be discharged to the river through the overflow pipe.
|
|
|
|
|
|
HQC-X935-CPA63
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|