Facility Name:
|
St Johnsbury
|
|
|
Jim Brimblecombe - Chief Operator
|
|
|
St. Johnsbury
|
|
|
CSO – 14: (Mill Street)
|
|
|
03/16/2025
|
|
|
03/17/2025
|
|
|
10:30 pm to 03:35 am
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
14838
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
Passumpsic River
|
|
|
Steve Beauregard
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High Flows caused by heavy rain on 03/16/2025 resulted in the discharge of a combination of sewage and storm water from CSO - 14. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system and to prevent backups into homes and other buildings.
|
|
|
|
|
|