Facility Name:
|
St Johnsbury
|
Caller Name And Title:
|
Jim Brimblecombe - Chief Operator
|
Municipality:
|
St. Johnsbury
|
Location (street or site):
|
CSO – 10: (St. Mary’s Street behind Chaloux)
|
Incident Start Date:
|
11/01/2024
|
Incident End Date:
|
11/01/2024
|
Incident Start End Times:
|
07:00 am to 09:00 am
|
Estimated Duration Of Event:
|
|
Nature Of Incident:
|
Authorized Wet Weather CSO Overflow
|
Estimated Volume (gallons):
|
7441
|
Cause Of Discharge:
|
High Flows
|
Type Of Obstruction:
|
|
Point Of Discharge:
|
Combined sewer overflow structure
|
Corrective Action Taken:
|
None
|
Waterbody Impacted:
|
Passumpsic River
|
Contact Name And Title For Public:
|
Steve Beauregard
|
Call Date:
|
|
WW Staff Called:
|
|
Type Of Notification:
|
nForms
|
Public Overflow Report For Web:
|
Y
|
|
|
|
|
|
|
Description Of Incident:
|
High Flows caused by heavy rain on 11/01/2024 resulted in the discharge of a combination of sewage and storm water from CSO - 10. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system and to prevent backups into homes and other buildings.
|
|
|
nForm Submission Number:
|
HQ7-VNPQ-CT4ZD
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|