|
Facility Name:
|
St Johnsbury
|
|
|
Jim Brimblecombe - Chief Operator
|
|
|
St. Johnsbury
|
|
|
CSO – 11: (Elm Street ball field)
|
|
|
08/08/2024
|
|
|
08/09/2024
|
|
|
09:00 pm to 03:30 am
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
242695
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
Passumpsic River
|
|
|
Steve Beauregard
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High Flows caused by heavy rain on 08/08/2024 resulted in the discharge of a combination of sewage and storm water from CSO - 11. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HQ5-RK4K-E4NSN
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|