|
Facility Name:
|
St Johnsbury
|
|
|
Steve Beauregard
|
|
|
Town of St Johnsbury
|
|
|
Intersection of the Passumpsic River and Moose River
|
|
|
02/24/2022
|
|
|
03/02/2022
|
|
|
02:00 pm to 02:00 pm
|
|
|
|
|
|
Other
|
|
|
>100,000 to 500,000 gallons
|
|
|
Crack/Hole in Pipe
|
|
|
|
|
|
Crack/hole in pipe
|
|
|
The Town has cut off the river crossing line. We are pumping sewage through a mechanical pump to the other side of river as a temporary fix. We will have a boring company come in asap and install a new river crossing line.
|
|
|
Passumpsic River
|
|
|
Steve Beauregard, Director of Public Works
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
Ice jam flowing from the Moose river appears to have punctured the river crossing.
|
|
|
|
|
|
HPF-WFMH-FKBZP
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|