|
Facility Name:
|
St Johnsbury
|
|
|
Steve Beauregard
|
|
|
St Johnsbury
|
|
|
CSO 10
|
|
|
02/27/2020
|
|
|
02/27/2020
|
|
|
08:00 am to 09:00 am
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
>100 to 1,000 gallons
|
|
|
High Flows
|
|
|
none
|
|
|
WWTF outfall
|
|
|
none
|
|
|
Passumpsic
|
|
|
Steve Beauregard, Director of Public Works
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on 2/27/20 resulted in the discharge of a combination of sewage and stormwater from CSO 10. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HNX-YWYW-PPZ42
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|