|
Facility Name:
|
St Johnsbury
|
|
|
Chad Whitehead, Town Manager
|
|
|
St Johnsbury
|
|
|
CSO 010
|
|
|
10/01/2019
|
|
|
10/02/2019
|
|
|
05:30 pm to 01:00 am
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
>1,000 to 10,000 gallons
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
Passumpsic River
|
|
|
Chad Whitehead, Town Manager
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
For authorized CSOs, we recommend the following text be entered into this field: High flows caused by an intense rain storm on 10/1/2019 resulted in the discharge of a combination of sewage and stormwater from CSO 010. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HNT-7GXH-0JZJQ
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|