|
Facility Name:
|
St Johnsbury
|
|
|
Hugh Wescott DPW Superintendant
|
|
|
St. Johnsbury
|
|
|
CSO #006,#009,#010,#011,#016,#
|
|
|
06/25/2019
|
|
|
06/25/2019
|
|
|
03:07 pm to 03:31 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
>100 to 1,000 gallons
|
|
|
High Flows
|
|
|
none
|
|
|
Combined sewer overflow structure
|
|
|
none
|
|
|
Passumpsic
|
|
|
Hugh Wescott DPW Superintendant
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on 6/25/2019 resulted in the discharge of a combination of sewage and stormwater from CSO# 006, 009, 010, 011, 016,This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HNQ-SMBF-JZRJM
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|