Facility Name:
|
St Johnsbury
|
Caller Name And Title:
|
Hugh Wescott Public Works Director
|
Municipality:
|
St. Johnsbury
|
Location (street or site):
|
CSO's #011, #021
|
Incident Start Date:
|
06/11/2019
|
Incident End Date:
|
06/11/2019
|
Incident Start End Times:
|
04:00 am to 06:30 am
|
Estimated Duration Of Event:
|
|
Nature Of Incident:
|
Authorized Wet Weather CSO Overflow
|
Estimated Volume (gallons):
|
>100 to 1,000 gallons
|
Cause Of Discharge:
|
High Flows
|
Type Of Obstruction:
|
none
|
Point Of Discharge:
|
Combined sewer overflow structure
|
Corrective Action Taken:
|
none
|
Waterbody Impacted:
|
passumpsic River
|
Contact Name And Title For Public:
|
Hugh Wescott Public Works Director
|
Call Date:
|
|
WW Staff Called:
|
|
Type Of Notification:
|
nForms
|
Public Overflow Report For Web:
|
Y
|
|
|
|
|
|
|
Description Of Incident:
|
High flows caused by an intense rain storm on 6/11/2019 resulted in the discharge of a combination of sewage and stormwater from CSO's #011, #021. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
nForm Submission Number:
|
HNQ-ECAQ-DBN7S
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|