Facility Name:
|
St Johnsbury
|
|
|
Hugh Wescott Public Works Director
|
|
|
St Johnsbury VT
|
|
|
CSO 006-Bay Street south of CVPS
|
|
|
06/29/2016
|
|
|
06/29/2016
|
|
|
11:15 am to 11:29 am
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
>100 to 1,000 gallons
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
none
|
|
|
Passumpsic River
|
|
|
Hugh Wescott Public Works Director
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on (June 29 2016) resulted in the discharge of a combination of sewage and stormwater from CSO-006 Bay Street south of CVPS. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
2GP-HD9D-Z7AB
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|