Facility Name:
|
Proctor
|
|
|
Nick Geneva / Wastewater chief operator
|
|
|
Town of Proctor
|
|
|
Park Pumpstation
|
|
|
05/10/2025
|
|
|
05/11/2025
|
|
|
12:00 am to 09:00 pm
|
|
|
|
|
|
Discharged untreated sewage
|
|
|
20000
|
|
|
High Flows
|
|
|
|
|
|
Pump station emergency overflow pipe
|
|
|
none
|
|
|
Otter Creek
|
|
|
Nick Geneva - wastewater chief operator
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
We received 2.5 inches of rain Friday after several inches of rain throughout the week which overwhelmed our sewer system and resulted in discharge through our emergency overflow. All pumps were in operation and there were no obstructions in the sewer system.
|
|
|
|
|
|
HQC-HB9N-7F7Y4
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|