Facility Name:
|
Proctor
|
Caller Name And Title:
|
Nick Geneva / Wastewater chief operator
|
Municipality:
|
Town of Proctor
|
Location (street or site):
|
Park Pumpstation
|
Incident Start Date:
|
05/10/2025
|
Incident End Date:
|
05/11/2025
|
Incident Start End Times:
|
12:00 am to 09:00 pm
|
Estimated Duration Of Event:
|
|
Nature Of Incident:
|
Discharged untreated sewage
|
Estimated Volume (gallons):
|
20000
|
Cause Of Discharge:
|
High Flows
|
Type Of Obstruction:
|
|
Point Of Discharge:
|
Pump station emergency overflow pipe
|
Corrective Action Taken:
|
none
|
Waterbody Impacted:
|
Otter Creek
|
Contact Name And Title For Public:
|
Nick Geneva - wastewater chief operator
|
Call Date:
|
|
WW Staff Called:
|
|
Type Of Notification:
|
nForms
|
Public Overflow Report For Web:
|
Y
|
|
|
|
|
|
|
Description Of Incident:
|
We received 2.5 inches of rain Friday after several inches of rain throughout the week which overwhelmed our sewer system and resulted in discharge through our emergency overflow. All pumps were in operation and there were no obstructions in the sewer system.
|
|
|
nForm Submission Number:
|
HQC-HB9N-7F7Y4
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|