Facility Name:
|
Proctor
|
Caller Name And Title:
|
Christopher Hayes-Operator
|
Municipality:
|
Proctor
|
Location (street or site):
|
Stiles Meadow Pump Station
|
Incident Start Date:
|
01/24/2019
|
Incident End Date:
|
01/24/2019
|
Incident Start End Times:
|
01:00 pm to 03:00 pm
|
Estimated Duration Of Event:
|
|
Nature Of Incident:
|
Discharged untreated sewage
|
Estimated Volume (gallons):
|
>1,000 to 10,000 gallons
|
Cause Of Discharge:
|
High Flows
|
Type Of Obstruction:
|
No obstruction
|
Point Of Discharge:
|
Pump station emergency overflow pipe
|
Corrective Action Taken:
|
Pulled pump 2 for rebuild.
Reset and had electrician confirm proper operation.
Will monitor frequently until pump 2 is installed.
|
Waterbody Impacted:
|
Otter Creek
|
Contact Name And Title For Public:
|
Christopher Hayes
|
Call Date:
|
|
WW Staff Called:
|
|
Type Of Notification:
|
nForms
|
Public Overflow Report For Web:
|
Y
|
|
|
|
|
|
|
Description Of Incident:
|
Extremely high flows due to significant rain storm with snow melt. Stiles Meadow Pump Station collects gravity flow and receives water from another pumping station.
Pump #2 Failed -motor. Pump #1 was barely keeping up with flow. Short to ground in pump 2 was causing the main power to trip also, interrupting pumping of 1.
|
|
|
nForm Submission Number:
|
HNM-2CFY-J8QQS
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|