|
Facility Name:
|
Royalton
|
|
|
N. Fredericks, Wastewater Facility Manager and Operator
|
|
|
Royalton
|
|
|
Across the street at 539 South Windsor Street Royalton Vermont. A broken, six in
|
|
|
11/29/2022
|
|
|
11/29/2022
|
|
|
01:15 pm to 03:45 pm
|
|
|
|
|
|
Other
|
|
|
>1,000 to 10,000 gallons
|
|
|
Crack/Hole in Pipe
|
|
|
|
|
|
Crack/hole in pipe
|
|
|
Pump station pumps were shut off. Pump station wastewater being diverted to Randolph WWTF via hauled septic pump trucks. 50x20 foot area of affected ground surface has been neutralized with spread of granular lime. The affected area is not near surface water (river, stream, ditches, culverts). The emergency repair of the broken pipe is scheduled for 11/30/22 AM.
|
|
|
None
|
|
|
N. Fredericks, Wastewater Facility Manager and Operator
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
Broken pipe caused surfacing untreated wastewater. Location is across the street from 519 South Windsor Street, Royalton. The town wastewater pump station was shut off and wastewater at the pump station is being pumped into tanker pump trucks until the repair is made on 11/30/22 in the AM. The 50x20 foot grass area that had the wastewater surfaced on it was neutralized with lime once the pipe and pump station were isolated. Estimated volume 3,000 to 5,000 gallons.
|
|
|
|
|
|
HPP-JDCG-RM2RG
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|