|
Facility Name:
|
Richmond
|
|
|
Brad Snow Assistant Superintendent
|
|
|
Richmond
|
|
|
441 Bridge Street
|
|
|
07/11/2024
|
|
|
|
|
|
|
|
|
|
|
|
Other
|
|
|
10000
|
|
|
High Flows
|
|
|
|
|
|
Other
|
|
|
We were trying to keep up with the flow from the town with a PandP pump truck and dumping it in an up-stream manhole because our wastewater facility is inaccessible, but our facility is too inundated that we ceased that process for now (instructed by Jaie Bates verbally.) We will probably start again when the river water recedes.
|
|
|
Winooski River
|
|
|
Stephen Cote
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
River water from the Winooski exceeded normal height and overflowed our sewer pump station and the manhole just in front of that, mixing raw sewer with river water.
|
|
|
|
|
|
HQ5-1PYF-1A6RS
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|