Facility Name:
|
Richmond
|
Caller Name And Title:
|
Brad Snow Assistant Superintendent
|
Municipality:
|
Richmond
|
Location (street or site):
|
441 Bridge Street
|
Incident Start Date:
|
07/11/2024
|
Incident End Date:
|
|
Incident Start End Times:
|
|
Estimated Duration Of Event:
|
|
Nature Of Incident:
|
Other
|
Estimated Volume (gallons):
|
10000
|
Cause Of Discharge:
|
High Flows
|
Type Of Obstruction:
|
|
Point Of Discharge:
|
Other
|
Corrective Action Taken:
|
We were trying to keep up with the flow from the town with a PandP pump truck and dumping it in an up-stream manhole because our wastewater facility is inaccessible, but our facility is too inundated that we ceased that process for now (instructed by Jaie Bates verbally.) We will probably start again when the river water recedes.
|
Waterbody Impacted:
|
Winooski River
|
Contact Name And Title For Public:
|
Stephen Cote
|
Call Date:
|
|
WW Staff Called:
|
|
Type Of Notification:
|
nForms
|
Public Overflow Report For Web:
|
Y
|
|
|
|
|
|
|
Description Of Incident:
|
River water from the Winooski exceeded normal height and overflowed our sewer pump station and the manhole just in front of that, mixing raw sewer with river water.
|
|
|
nForm Submission Number:
|
HQ5-1PYF-1A6RS
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|