|
Facility Name:
|
Richmond
|
|
|
Brad Snow
|
|
|
Richmond
|
|
|
281 Esplanade and adjacent streets
|
|
|
07/11/2024
|
|
|
07/11/2024
|
|
|
05:00 am to 03:30 pm
|
|
|
|
|
|
Other
|
|
|
10000
|
|
|
High Flows
|
|
|
|
|
|
Manhole
|
|
|
Pumps were given time to catch up and flood water receded enough for us to determine we were no longer discharging sewer water from this point.
|
|
|
Winooski River
|
|
|
Stephen Cote
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
Inflow due to flooding to the plant exceeded influent pump and wet well limits causing backflow through the collection system to the volunteers green and the edge of church street and esplanade.
|
|
|
|
|
|
HQ5-1VZQ-584F8
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|