Facility Name:
|
Richmond
|
|
|
Nate Fredericks, Operator
|
|
|
Richmond
|
|
|
Bridge Street Bridge
|
|
|
12/19/2023
|
|
|
12/20/2023
|
|
|
02:30 pm to 04:25 pm
|
|
|
|
|
|
Other
|
|
|
Other
|
|
|
Other
|
|
|
|
|
|
Other
|
|
|
Crews onsite now assessing temporary piping installation.
|
|
|
Winooski River
|
|
|
Steve Cote - Operator
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
Bridge Street Bridge wastewater pressurized forecemain under the bridge crossing is broken by debris from flooded Winooksi River.
Revision on 12/20/23 at 4:25pm: Pipe was not broken. Insulation and hangers were damaged but pipe was not leaking and otherwise functioning.
|
|
|
|
|
|
HQ0-0S6V-EZW85
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|