Facility Name:
|
Richmond
|
|
|
Nathaniel Fredericks
|
|
|
Richmond
|
|
|
Richmond Wastewater Pump Station at West side of Bridge at Bridge Street along W
|
|
|
07/10/2023
|
|
|
07/12/2023
|
|
|
10:00 pm to 06:30 am
|
|
|
|
|
|
Discharged untreated sewage
|
|
|
Other
|
|
|
Other
|
|
|
|
|
|
Other
|
|
|
As of 7/11/23 at 1800hr, facilities staff still waiting for flood waters to recede in order to assess damage and mobilize plan for repairs.
As of 7/12/23 at approx 0630, the pump station was accessible as the flooding had receded. The pump station is functional and does not appear to have suffered damages. Electrical and controls will be further evaluated by a licensed electrician as soon as one is available to inspect. At this time there are no estimated repair costs.
|
|
|
Winooski River
|
|
|
Josh Arneson, Richmond Town Manager
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
Flooding of the Winooski River at Bridge Street location starting on 7/10/23 has covered top of the wastewater pump station (access to valves, controls and pumps) starting approximately 7/10/11 at 2200hr, and still under flood water and not accessible for inspection as of this incident report submission on 7/11/23 at 1800hr.
|
|
|
|
|
|