Facility Name:
|
Bennington
|
|
|
Gail C. Tiffany, Bennington WWTF Laboratory Director
|
|
|
Town of Bennington
|
|
|
Houghton Street, North Bennington, VT
|
|
|
12/24/2017
|
|
|
12/24/2017
|
|
|
02:15 pm to 02:30 pm
|
|
|
|
|
|
Discharged untreated sewage
|
|
|
50 gallons
|
|
|
Obstruction/Blockage
|
|
|
Unknown
|
|
|
Manhole
|
|
|
Operators used the jetter to clear the line which allowed the manhole to drain completely (manhole had started to drain before operators arrived allowing overflow to stop). Whatever obstruction/plug was in the line was alleviated; it was not determined what that obstruction/plug was
|
|
|
Paran Creek, North Bennington, VT (assum
|
|
|
Ron Bull, Bennington WWTF Chief Operator
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
Operators were notified at approximately 2:15 pm on December 24th, 2017 that a manhole on Houghton Street (N. Bennington) was overflowing. Operators responded and found that the overflow had stopped but could see where some of the overflow had made its way to a nearby DI. Estimate of overflow is less than 50 gallons.
|
|
|
|
|
|
HNA-D49G-TF7ED
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|